Case Studies

Enfield Evangelical Free Church, Enfield

Scope of works: Distribution of mechanical and electrical services from centralised plant room to new build, independent Evangelical Church building and auditorium. Comprising medium duty cable basket containment serving small power distribution, specialist lighting with auditorium scene control functionality, fire alarm, data, audio visual and control wiring and disabled toilet alarms. Also including designated plant Read more>>

Grand Union Village, Greenford

Scope of works: Major, high profile waterside regeneration scheme comprising 85 mixed tenure homes on 54 acre brownfield site situated alongside the Grand Union Canal. Mechanical works included design and installation of centralised plant room with DDC Seimans BMS together with two CHP units with mains control lighting to each CHP set. Mains cold water Read more>>

Cockfosters Road, Barnet

Scope of works: New build luxury development backing on to Hadley Wood Golf Club of four, 3 bedroom apartments, garden apartment and penthouse for developer Thameside Construction. Project comprised mains cold water and gas pipework installation together with pumps and low temperature hot water pipework, underfloor heating and cooling systems to each apartment. Main electrical Read more>>

Beit Schvidler Primary School, Edgware

Scope of works: Electrical and mechanical installation featuring BMS system to new build, co-educational Jewish primary school. Works included installation of centralised plant room, gas pipework and boilers, mains cold water booster set and kitchen gas safe system. The heating system, via two gas fired condensing boilers, serves under floor heating throughout the school. Project Read more>>

Stanburn Junior School, Harrow

Scope of works: New build annex incorporating seven classrooms, toilet block and plant room for distribution of mechanical and electrical plant dovetailing to the school’s existing buildings. Mechanical works included mains cold water booster set, main gas pipework installation to wall mounted gas boilers, pumps and low temperature hot water pipework. Photovoltaic heat generation via Read more>>

Gable Hall School, Thurrock

Scope of works: New build SEN extension building comprising toilet block, welcome area, engineering and motor workshops, kitchen and teaching rooms to existing Specialist Performing Arts College and Leading Edge school. Project featured installation of centralised plant with BMS system within designated plant room; mains cold water; main gas pipework and boilers; pumps and low Read more>>

Grove Primary School, Romford

Scope of works: Two phase project comprising mechanical and electrical design works and associated specialised controls to new two storey, nine classroom school block along with minor enabling works to four existing classrooms and toilet block. Also featuring installation of centralised plant, mains cold water booster set and gas pipework, low surface temperature radiators and Read more>>

University of Bedfordshire

Scope of works: Mechanical services installation and associated specialised control systems to new £34 million Campus Centre comprising 240 seat lecture theatre, exhibition area, Students’ Union support services, executive offices, eateries and informal learning spaces. Project included installation of incoming mains cold water, main gas pipework, three gas fired condensing boilers to ground floor level Read more>>

The Bishop’s Ave, London

Scope of works: Mechanical and electrical services to new, seven bedroom mansion featuring servants’ quarters, swimming pool, gym and beauty salon. Comprising installation of centralised plant in designated plant room with direct digital control BMS; mains cold water booster set; main gas pipework and associated supplies; comfort cooling cassette/heat pump package; under floor heating and Read more>>