Scope of works:

Two phase project comprising mechanical and electrical design works and associated specialised controls to new two storey, nine classroom school block along with minor enabling works to four existing classrooms and toilet block.

Also featuring installation of centralised plant, mains cold water booster set and gas pipework, low surface temperature radiators and hot and cold water to classrooms, and above ground drainage to toilet areas. New 100amp sub main supply, containment consisting medium duty cable tray and trunking, new small power to classrooms and toilet block, access control, intruder and fire alarm systems interfaced with existing building was also included.

The project achieved a 25% improvement over Part L 2010 by using passive saving measures, energy efficient lighting and roof mounted PV panels. The project achieved a Breeam target of  ‘Excellent’.