Scope of works:

Mechanical services installation and associated specialised control systems to new £34 million Campus Centre comprising 240 seat lecture theatre, exhibition area, Students’ Union support services, executive offices, eateries and informal learning spaces.

Project included installation of incoming mains cold water, main gas pipework, three gas fired condensing boilers to ground floor level main boiler house and three sub plant rooms with BMS controls serving 650, one-bed en suite student accommodation.

Provision of 1000 litre capacity hot water storage vessels to each campus building, above ground soil and vent waste drainage systems and below ground district heating served from boilers as well as extension to the hot and cold water supply from point to point entry of the building formed part of the works.